Seven service lines, one party accountable

Bulgarhouse takes the project from the first consultation to commissioning. Below is exactly what the work on each track covers.
Service lines

The full cycle, broken down into tracks of responsibility

Every track is closed by our own team. The contractor dictates neither timelines nor decisions. Expand a line to see the scope of work.
Choose your goal:
I own a plot in VarnaI need a main contractor / developerI want to invest in property
01
INVESTMENT AND ASSET MANAGEMENT

The asset is chosen to fit the goal, not the other way round

  • Advice on any real-estate matter
  • Sourcing a property or a land plot
  • Buying, selling and managing property
  • Structuring a joint investment vehicle
  • Negotiation support, with rights and obligations put on paper
  • Running the project from concept to commissioning
02
STRATEGIC ANALYSIS

The decision on a plot is made on the numbers

  • Assessment of planning rules, parameters and risks
  • Recommendations on development, use or sale
  • Property valuation and raising its investment appeal
  • Market research and sourcing of opportunities
03
PERMITTING AND DOCUMENTATION

The land comes out of the deal clean

  • Legal due diligence on documents, title and property status
  • Review of technical documentation
  • Construction and renovation permits
  • Permit for use (commissioning)
  • Liaison with the municipality and utility providers
04
ECOLOGY AND ENVIRONMENT

Comfort is engineered upfront, not fixed afterwards

  • Designing spaces for comfort and function
  • Control of material quality, sustainability and safety
  • Energy efficiency through passive technologies
05
ARCHITECTURE AND ENGINEERING

Architect and engineer work in a single model

  • Working with architects and developing the concept
  • Design supervision and issuing technical briefs
  • A single design set from concept to working drawings
06
PROCESS MANAGEMENT

Construction follows the design, not circumstances

  • Tendering and contractor selection
  • Setting up construction supervision
  • Technical reports and briefs
  • Coordinating design with the municipality and utilities
07
TRANSPARENCY AND CONTROL

The owner’s interests are protected on paper

  • Quality-control processes
  • Construction risk insurance
  • Full representation of the client’s interests
  • Legal and tax support
What’s next

One contract for the whole cycle

There are no gaps between stages, because the stages are never handed off between companies. Tell us about your plot — we’ll come back with a feasibility assessment and a plan for the first stage
Stage timelines
Initial consultation
free
Plot audit
from 5 business days
Concept and feasibility study
from 3 weeks
Construction supervision
for the life of the project